SIS v5.0 — Public Review

SIS v5.0 · Public review

Spera Impact Standard v5.0

Environmental value needs evidence, ecological integrity and accountable decisions that can be followed back to their competent sources.

69chapters
101appendices
v0.51public review draft

Read the edition in context

2. November 2026 – Public Review Draft v0.51

This is a public review draft. Publication here does not establish adoption, entry into force, a freeze, certification, regulatory eligibility or conformity of any project or implementation.

SIS v5.0 connects physical reality, evidence, rights, competent decisions, registry history, economic provenance and permitted claims. Each source retains responsibility for its own domain. The website provides an introduction; the controlled standard and appendices govern the meaning of their requirements.

The portal may require sign-in and appropriate access. Ask for review access if you cannot open the library.

Ecological integrity at the centre

These eight plain-language themes introduce the ecological integrity provisions incorporated through BIO-002. They are an explanatory grouping, not the numbering of its change-control work packages, and do not replace the normative text or its applicable scope.

Principle 01

Ecological Integrity Before Marketability

Ecological condition, rights and unresolved obligations must remain visible before market use is considered. A transaction cannot turn ecological deterioration into an acceptable outcome.

Principle 02

Non-substitutability

Carbon, biodiversity, ecosystem condition and social outcomes retain their own identity and evidence. A positive result in one dimension does not automatically compensate for harm in another.

Principle 03

Indicator integrity

Methods, baselines, coverage, uncertainty and indicator limitations remain attributable. A convenient proxy or aggregate cannot silently replace the ecological condition it represents.

Principle 04

Ecological states through time

Observed, assessed, expected and unresolved conditions must remain distinguishable. Time, stale evidence, conflicting observations and corrections affect what can responsibly be concluded.

Principle 05

Ecological accountability debt

Unresolved ecological obligations remain assigned, visible and reviewable. Payment or administrative closure alone does not close an ecological obligation; competent evidence is required.

Principle 06

Stewardship finance

Financing supports continuing stewardship and its responsibilities. Financial receipts, allocations and contractual performance remain distinct from demonstrated ecological outcomes.

Principle 07

Multi-outcome rights and claims

Different outcomes may be connected, but their rights, attribution, quantities, periods and permitted claims require separate justification. Connectivity does not create equivalence or permission.

Principle 08

Ecological integrity challenge

Ecological integrity must remain open to challenge through an accessible process and competent independent review. A completed transaction does not remove accountability.

Keep sources and authority connected

Evidence is not a decision

Observation, inference, assessment, verification, authorisation, accounting and claims are distinct functions. Reference the responsible source and retain its scope, time and limitations.

Unknown stays unknown

Missing, restricted, conflicting, stale and undetermined information must remain distinguishable. It cannot silently become satisfied, verified or compliant.

Technology remains a choice

SIS describes accountability and semantic requirements without making one vendor or platform the standard. Product-specific implementation details belong in the relevant technical documentation.

History is not the current edition

The v4.0 corpus and A00–A90 manifest provide historical migration context. They are not the v5.0 master. Older website articles and downloads must be read in their original context.

Make feedback traceable

Identify the edition, chapter or appendix, requirement reference, observed issue and proposed change. Include supporting evidence and the effect on connected requirements where relevant. Do not send confidential project material through an initial public enquiry.

Useful source anchors include SIS5-CH-01-008, SIS5-CH-01-009, SIS5-BIO-INV-001, SIS5-CH-41-BIO-01 and SIS5-CH-41-BIO-02. Read the full clauses and associated definitions in the controlled edition.