Sovereign architecture · SISTA · National nodes
National capability with sovereign authority
Connect project evidence with competent national decisions, authorisation records and the requirements governing credit availability.
Within the SIS v5.0 architecture, SISTA supports sovereign processes. Spera ACT develops and delivers national nodes where desired. National institutions retain their decision-making authority.
No Objection, Authorisation and Corresponding AdjustmentsAn overview of the SIS v5.0 architecture. Normative stewardship belongs with the Foundation; sovereign decisions belong with the competent authorities.
Institutional responsibility
Keep decisions and sources visible
A project assessment, a national authorisation, an accounting obligation and a registry event describe different things. Their connection must be documented without merging their authority.
Understand the applicable requirement
Identify the country, responsible institution, programme, credit category, relevant period and intended use. These determine which sovereign records and conditions need to be examined.
The architecture must preserve the basis for each determination, including its scope, conditions and current status.
Preserve the competent decision
Record who made the decision, under which mandate, what it applies to and which evidence supports it. A platform status must remain linked to the relevant source record.
Technical checks support the process. They do not confer sovereign authority or turn project evidence into an authorisation.
SISTA · Sovereign technical architecture
Connect sovereign processes and gates
SISTA is the interface between EcoSpera and the applicable gate governing credit availability in ECR.
It supports the workflows and documentation connecting project evidence, national institutions and sovereign decisions. The requirements depend on the applicable pathway and intended use.
- Connect the relevant recordsLink project identifiers and evidence to no-objection records, authorisations, conditions and corresponding-adjustment processes where applicable.
- Preserve scope and statusKeep the issuing authority, decision scope, relevant period, conditions and status visible.
- Support the gate assessmentMake the relevant sovereign records available to the applicable process governing credit availability in ECR.
- Retain national authorityCompetent institutions remain responsible for sovereign decisions and national accounting.
Spera ACT · Development and delivery
Build national nodes with clear mandates
Spera ACT develops and delivers national nodes where this is desired, working with the relevant national institutions.
Spera ACT GmbH is being established in Lugano, Switzerland, as a 100% owned subsidiary of Spera Impact AG. Its development and delivery role supports national capability while preserving competent-authority decision rights.
Identify the responsible actors
Define participating institutions, legal mandates, decision responsibilities and the roles needed to operate the node.
Distinguish national decision-making, project development, assessment and technical operations.
Define the implementation scope
Agree the workflows, record requirements, access arrangements and interfaces needed for national participation.
Connect the node with relevant project documentation and SISTA-supported sovereign processes.
Prepare continued operation
Define operating responsibilities, training, support and the handling of changes and unresolved issues.
Implementation scope and operational availability must be documented for the specific national engagement.
No Objection · Authorisation · Corresponding Adjustments
Keep records and meanings distinct
A national document, an authorisation and an accounting record must be examined for what each actually establishes.
Letter of No Objection
Identify the issuing institution, project, scope, conditions and current status. Assess the meaning of the document within the applicable national process.
A no-objection record must not be treated as an authorisation or proof of a completed corresponding adjustment merely because it is present.
Letter of Authorisation
Examine the competent authority, authorised scope, intended use, relevant outcomes or units, period and any conditions or changes.
An authorisation must remain distinguishable from project acceptance, independent assessment, credit issuance and marketplace access.
Corresponding-adjustment obligation
Record whether a corresponding adjustment is applicable to the identified pathway and the basis for the obligation. Preserve the responsible actor, relevant conditions and reporting context.
An obligation or commitment does not by itself demonstrate that an adjustment has been reported or accounted for.
Reported or accounted adjustment
Reference the competent reporting or accounting source, relevant period, scope and status. Keep the connection to the associated authorisation and outcomes or units traceable.
The record should state what is evidenced and what remains outstanding, rather than collapsing the process into a single completed label.
The applicability and meaning of these records depend on the national framework, programme and intended use. No single document or platform status establishes all aspects of eligibility.
Connected infrastructure · Distinct mandates
Connect records and responsibilities
The principal pathway connects EcoSpera, SISTA and ECR. Project development and market access each retain their own responsibilities.
Spera ACT and EcoSpera
Spera ACT handles applications and project development. EcoSpera supports documentation and evidence, with sources and assessment responsibilities preserved.
National institutions and SISTA
Competent authorities determine sovereign matters. SISTA connects relevant processes and records to the applicable gate.
ECR
Applicable gate requirements govern credit availability. ECR records Smart Credits, Greens and their lifecycle history within its registry mandate.
SperaNex and integrations
SperaNex is the independently owned first marketplace and Treasury. Product integrations reference upstream evidence, decisions and registry records.
This is an architecture overview, not a universal sequence of approvals. Project activation, sovereign authorisation, accounting, issuance, market availability and retirement are distinct events. The applicable prerequisites govern each dependent action.
Evidence integrity · dMRV and zkMRV
Understand evidence and proof
Digital records and cryptographic proofs support traceability. Their meaning depends on the data, method and statement being verified.
Digital monitoring and records
dMRV supports digital monitoring, reporting and verification workflows. Project evidence may include observations, measurements, documents, assessments and their provenance.
Measurement cadence, coverage, method and limitations must be documented. A digital system does not automatically establish continuous observation of every relevant fact.
Cryptographic proof and its scope
Where zkMRV is used, identify the statement proved, its inputs, assumptions and verification scope. A valid proof establishes the defined statement within that scope.
A proof or document hash does not independently establish environmental accuracy, legal authority, authorisation or completion of national accounting.
Documents and independent assessments remain relevant
Authorisations, legal instruments, consent records and competent assessments retain their substantive role. Digitisation and cryptographic integrity connect and protect records; they do not remove the need to examine the underlying document, evidence or decision.
Claims of conformance, eligibility and permitted use must reference the applicable requirements and competent determinations.
External framework context
Article 6 and competent sources
Article 6 includes different forms of international cooperation. The applicable route must be identified before interpreting authorisation, accounting and reporting requirements.
Use the applicable official guidance
Article 6.2 provides accounting and reporting guidance for internationally transferred mitigation outcomes used towards nationally determined contributions. Article 6.4 establishes a UNFCCC crediting mechanism, while Article 6.8 addresses non-market cooperation.
UNFCCC Article 6 overviewKeep external recognition distinct
Participation in SIS infrastructure does not itself establish Article 6 authorisation, UNFCCC approval, CORSIA eligibility or any other external recognition.
The relevant national decisions, programme requirements and official determinations must be examined for the actual pathway and intended use.
UNFCCC decisions and documentationProjects · National nodes · Impact investors
Begin with your responsibility
Choose the pathway relevant to the work you want to begin.
Develop your national node
Discuss national requirements, competent institutions, workflows and delivery scope with Spera ACT.
Discuss national-node deliverySubmit your project application
Contact us to confirm the current application route and the responsible development team. Document the project basis and relevant national requirements.
Apply with your projectExamine the project pathway
Assess project or SPV structures, due diligence and relevant sovereign conditions before considering financing.
Discuss impact investmentSpera Impact AG does not solicit equity. Financing is considered at project or SPV level, subject to the relevant documentation and terms.